Industrial
Building Infrastructure
The company & its associates has wide experience in executing civil engineering works in the following Industrial Sector
3X210MW Thermal Power Plant of WBPSCL, Bakreshwa (Pump Houses, DM Plant etc.)
3 x 20 MW Co Gen Captive Power plants (Piling, Civil & Structural works & Misc works of IOCL, Haldia)
1x210 Mejia TPS, Mejia (Auxiliary Buildings & Plant Roads & drains)
3 x 18 MW Power & Blowing station at IISCO Burnpur (Complete Civil & Structural work for Power house, TG, DM plant, Transformer Building, RC multi flue Chimney)
2X250MW Thermal Power Plant of CESC, Budge Budge (Coal Handling Plant, Ashtrap)
2x210 MW Thermal Power Plant of UPVRNL, Parichha (Ash Handling Plant)
2X250 Bhilai TPS BESCL, Bhilai (Ash handling Plant)
Cross Country Pipe conveyor of Macmet, Raigarh
Alumina Expansion of Hidalco, Muri (Coal handling, Bauxite handling & System
Chip Handling System at Hindalco Hirakud (structural work Chip handlin
Wagon Tippler and Conveying Plant at NTPC Talcher (Civil work including engineering & design on Lumpsum package)
SteSteel Foundry Project of HDC, Kolkata (Furnace fdns, Eqmnt fdns, Aux. Bldgs etc.)
Aluminum Foils Expansion of Indian Foils, Kolkata
Ductile Iron, Coke Oven, & Sinter plant of (Shed & Buildings, Eqmnt fdns)
Electrosteel , Kolkata / Haldia (Furnace fdns, Mills fdns, bldgs)
Expansion of BALCO, Korba (Green Anode Paste plant)
Steel Forging plant of Mackeil, Durgapur (4000T press foundation, shed & buildings)
Smelter Expansion at Hindalco Hirakud (Civil, Structura work including rock excavation)
Food Processing Plant of Allana, Mourigram (Roads, Lairages, Eff. Treatment plant)
Retail & Food process & storage of Keventer, Barasat (Sheds & buildings)
Linen Plant Expansion for Jayshree Textiles (PEB shed 20000sqm area)
Expansion Project at EXIDE, Haldia (PEB Shed with FM2 flooring, RC Buildings)
Cement Grinding Unit of HIL, Jasidih (Silos, bunkers, mill fdns)
 
Following special type of engineering skills were adopted in course of execution of work:
Sheet piling & shoring work for deep excavation up to 17m in limited space, running factory, adjacent to river, etc.
Special dewatering like well point, tube well type etc.
Well sinking for deep structures like Transfer points and connecting with conveyor tunnels below ground.
Slip form shuttering for RC chimney works.
Installing RC piles up to 1000mm diameter with rock socketting / 40m depths.
Waterproofing for deep / water retaining structures including hydro testing
Geotextile & LDPE lining
Project Management & Detail Engineering with project latest techniques & software's
  
INDUSTRIAL PROJECTS
 
Civil & Structural work Bauxite Handling Plant Piling, Civil & Structural work for 20MW CPP Twin Wagon Tipplers Coal & Bauxite Handling Plant Control Room for Power plant
     
Silos in Cement Grinding Unit Ball Mill structure RC Chimney Retail Process/ Package store
 
Civil work 15T
 Arc Furnace
1000mm dia RC Pile
 with Rock Socket
Civil & Structural 
Intake Pump House
Industrial Shed Civil Work for 
Track hopper 
  